The short version
- Two developer networks in the West Weber corridor, inside UIPA's West Weber Project Area, used the same move: get more units approved on the same land, and market part of it as "affordable" or "attainable."
- Katrina Gibson's parcel (15-326-0001) transferred to Bennet LLC (Black Pine) on Jan. 8, 2026, the same day she filed her County Commission candidacy. The county's own notice says the 550-acre Bennet Farms assembly is "formerly Gibson Farms," and the rezone asks the county to create a new TN/FB zone.
- Three financing districts tied to this network work very differently: PCC PID has a $150,000,000 debt limit and diverts future tax increment; Sage Creek IFD's $8,155,000 is repaid only by owners inside it; Longhorn IFD's board is two-thirds Lync Construction and its petitioners waived the whole protest period.
- Nilson Homes' JDC Ranch went from 725 to 1,000 units on 240 acres. The "Attainable Starter Home" base is capped at $400,000 before garage, basement, and landscaping, while a market-rate townhome in the same community lists at $399,975.
- Several public officials hold more than one role in the same file: Stephanie Russell (county director, LMSA Manager, LMSA lobbyist), Jon Beesley (disclosure gaps on Lync work), and Sharon Bolos (undisclosed family tie to Nilson Homes).
- Pat Burns — Owner of Lync Construction/Lync Development; developer behind Herrick Estates, West Creek, Sage Creek and Longhorn; appointed to LMSA's board in 2024
- Daniel Stephens — Principal behind the Black Pine brand (Bennet LLC); spoke at UIPA board meetings on West Weber
- Katrina Gibson — 2026 Weber County Commission candidate; her parcel went to Bennet LLC the day she filed
- Kerry Gibson — Former County Commissioner; paid lobbying contract with Plain City for 3.5+ years; Partner at Lincoln Hill Partners
- Stephanie Russell — Weber County Economic Development Director, LMSA Manager, and paid LMSA lobbyist through her own DBA
- Jon Beesley — Plain City Mayor, Jan. 2018–Jan. 2026; worked for Lync Construction; gaps on his own disclosure forms
- Sharon Bolos — Weber County Commissioner; undisclosed family tie to Nilson Homes VP Bryan Arrington; championed the JDC Ranch amendment
- Steve Waldrip — Gov. Cox's senior housing adviser; worked with Nilson Homes on the JDC Ranch "attainable homes" pitch
What it is
This case looks at land in West Weber, out by Plain City and Farr West. All of it sits inside a state project area run by the Utah Inland Port Authority, called UIPA.
Two groups of developers work here. One is built around Pat Burns and his company Lync, plus Black Pine (Bennet LLC). The other is Nilson Homes and its JDC Ranch.
Both used the same move. They got more homes approved on the same land. Then part of it was called "affordable" or "attainable." The question here is simple: did adding homes lower prices for buyers, or mostly mean more homes sold near market price?
What the records show
- The Gibson land. Katrina Gibson's parcel went to Bennet LLC (Black Pine) on Jan. 8, 2026. That is the same day she filed to run for County Commission. The county's own notice says the 550-acre Bennet Farms land is "formerly Gibson Farms."
- A new zone. The Bennet Farms rezone asks the county to create a brand-new zone, "TN/FB," instead of using one it already has. It also adds an open-space zone along the Weber River.
- Lots added mid-process. Herrick Estates, a Burns project, grew from 91 lots on 30.65 acres to 93 lots on 32.112 acres between the Planning Commission and the County Commission.
- JDC Ranch. Nilson Homes first proposed 725 homes on 240 acres. In 2024, the county approved 275 more, called "attainable," for 1,000 total.
Why "attainable" matters.
The "Attainable Starter Home" base price is capped at $400,000. That price does not include a garage, basement, or landscaping. A county planner said on the record they are about 900 square feet.
A regular market-rate townhome in the same community already lists at $399,975, with nothing left out. So the "attainable" home may not be cheaper, and could cost more once it is finished.
To be fair: the attainable homes carry a 10-year deed restriction to keep them away from corporate renters. And the density increase and the label were both openly on the public record.
The program is aimed at first-time buyers, teachers, firefighters and active-duty military. They have the least room to absorb the extra costs.
Three money districts, three different deals
A money district borrows to build roads, sewer and water lines. How it pays the loan back is what matters.
| District | Size | Who pays it back |
|---|---|---|
| PCC PID | $150,000,000 debt limit | Future tax growth taken from the school, fire and water districts (50% each) and the county (75%) for 15 years |
| Sage Creek IFD | $8,155,000 in bonds | Only the owners inside the district. Nothing taken from other taxing groups. |
| Longhorn IFD | Costs "exceed $1,000,000" | Owner-assessment district; full repayment terms not in the papers reviewed |
Sage Creek is the fair version. For it, "this doesn't cost the schools" is true. For PCC PID, it is not.
At PCC PID and Longhorn, owners signed away the public's protest period in writing. Longhorn's board is two-thirds Lync Construction staff, by their own email addresses. One real safeguard: if Longhorn's developer defaults, the zoning goes back to farm use. PCC PID has already grown twice without a new public hearing.
The people with more than one job
- Stephanie Russell is the county's Economic Development Director, the Manager of the sewer district LMSA, and a paid lobbyist for LMSA through her own business. As director, she got approval to send LMSA's federal sewer money to PCC PID's lift station.
- At that same meeting, Pat Burns was put on LMSA's board.
- Jon Beesley was Plain City mayor while he worked for Lync. His forms say "consulted on projects." A text he sent, checked with the person who got it, says "superintendent." His 2025 county form left out four things his Plain City form listed.
- Kerry Gibson had a paid lobbying contract with Plain City under Beesley for at least 3.5 years.
- Sharon Bolos, a county commissioner, has a family tie to a Nilson Homes VP that she did not disclose. She voted on Nilson items and praised the JDC Ranch increase.
What we don't know yet
- What an attainable home really costs once garage, basement and landscaping are added. No closed sale was found.
- Why the Gibson land moved on the same day she filed.
- Whether PCC PID's added land overlaps UIPA's tax capture zone. This is not confirmed and is not claimed here.
- Why Beesley's forms and his text describe his job differently.
The UIPA West Weber area covers 8,967.74 acres. It was adopted May 20, 2024, over a petition with 1,515 signatures. Its plan has one sentence on tribal heritage, next to several pages on wetlands.
Questions to ask
- Weber County Planning Division and County Commission: what does an attainable home cost once it is finished?
- Western Weber Planning Commission: did the new TN/FB zone get more review than a normal rezone?
- Weber County Clerk/Auditor: has Commissioner Bolos ever disclosed her Nilson family tie in a Nilson vote?
- School, fire and water district boards: how much of your tax growth goes to PCC PID each year?
- Weber County Commission: will the public get a hearing before a district grows again?
Updates since this was posted
- Oct. 28, 2026 Correction: "chief sponsor" changed to "primary sponsor"; Katrina Gibson's card now notes she was eliminated in the June 23, 2026 primary; a research note was reworded. (Hive correction)
- Oct. 21, 2026 At the Legislature's Economic Development and Workforce Services Interim Committee, UIPA Executive Director Ben Hart described a Weber County regional wastewater lift station partnership opening up West Weber, and, asked whether off-site increment-funded infrastructure could serve a data center, said the West Weber wastewater facility "potentially" could be used by one (per the official meeting video's captions). He also said tax differential runs 25 years, extendable to 40. (Utah Legislature, EDWS Interim Committee meeting video, Oct. 21, 2026)
- Feb. 9, 2026 UIPA's loan letter to the Legislature's Executive Appropriations Committee, signed by CFO Ariane Gibson, reports the $5 million, 3-year, 3.28% Authority Infrastructure Bank loan to PCC Land, LLC for West Weber sewer infrastructure was executed Dec. 15, 2025. (This record was read after the page was posted and is not on the page.) (UIPA loan letters to the Executive Appropriations Committee, Feb. 9, 2026)
- June 23, 2026 Weber County Commission primary results: in Seat A, Duane Kearsley won (31.2%) and Katrina Gibson (25.2%) was eliminated; in Seat B, Jon Beesley won 55.6% to incumbent Sharon Bolos's 44.4%. (Predates the page, but the page still lists Gibson as a candidate; Bolos remains commissioner until her term ends.) (Standard-Examiner, June 25, 2026; Ogden Valley News)
Connecting stories
- Case 05 · The Trustee Signed His Own DealSame Utah Forward PAC, Laura Warburton, Katrina Gibson and the Lewis/Dunleavy network this page says funds both sides of this file.
- Case 06 · The Lots That WaitJohn Lewis and Shane Dunleavy, whose network this page names as a Utah Forward PAC funder.
- Case 04 · The Applicant Holds Those RightsMike Schultz previously led the home builders' board Pat Burns now sits on; that case also runs through UIPA.
- Case 02 · The Backstop That Became a BypassSteve Waldrip and H.B. 68 appear there too, in another county's housing fight.
- The Inland Port at the LegislatureChecks UIPA's own claims, including the $5 million PCC Land loan for West Weber sewer work.
- Steve WaldripFull case file on the housing adviser who worked with Nilson Homes on the JDC Ranch pitch.
- Laura WarburtonRuns Utah Forward PAC, which this page says Nilson Homes and the Lewis/Dunleavy network both funded.
- Chris RoybalUtah Forward PAC member; his page covers West Weber and Nilson's JDC Ranch work.
- Mike OstermillerDirector of the Nilson Foundation, led by Nilson Homes CEO Jed Nilson.
- EDCUtahMarkets the West Weber Mega Site on the same corridor as UIPA's West Weber project area.