Utah Hive Politics logoUtah Hive Politicsfrom the publisher of The Weber County HiveThe people's publication. We investigate what's best for the public as a whole, not any party or special interest.
← All Ogden City pages  ·  Hive library ↗Ogden City · Records

CASE FILE · PINEVIEW PIPELINE PROJECT · OC 012

Pineview's flowing well was reportedly capped. Here's what we could verify.

The drawdown for Ogden's pipeline project exposed a 1915 well that was still flowing. The state inspected it and recommended sealing it with cement from bottom to top. A Nov. 15 post said it was capped. We have not located a record showing who did the work, when, or how.

Water right 35-1983Well ID (WIN) 452337Drilled 1915 · 65 ftFlow: about 20.5 gal/min (Sept. 25)

Posted Nov. 19, 2026 · Updated Nov. 19, 2026

WHAT
A 1915 flowing well on the floor of Pineview Reservoir

In plain words

When Pineview was drained for Ogden's pipeline project, an old well on the reservoir floor turned out to still be flowing. The state's Division of Water Rights inspected it in September. It said that if the water ever stops flowing up, the open pipe could let reservoir water run down into the groundwater, so it recommended filling the whole well with cement. On Nov. 15, a local news page said the well had been capped. We have not located a record of who did the work, when, how, or who paid. We also haven't confirmed that the well in the Nov. 15 post is the one the state inspected.

Explain it like I'm 10

The short version

Map and photos

Marker: the coordinates in the state memo (41.2542100, -111.7970750), Section 14, Township 6 North, Range 1 East. Map tiles © OpenStreetMap contributors.

State memo map showing the well about 500 feet from Pineview's south shore, north of parcel 200150016
Memo Map 1: well location, about 500 feet from the south bank. Utah Division of Water Rights, Sept. 28, 2026.
Wide view across the drained lakebed looking north, with the well in the distance
Memo Photo 1: looking north from the south bank. The well is center left, with water flowing southwest from it.
Wellhead stick-up measured at 44 inches, with water pouring from the side
Memo Photo 2: wellhead stick-up of 44 inches.
Top of the mineral-crusted wellhead with a tape measure across it
Memo Photo 3: outside diameter of the wellhead, about 8 inches.
Water flowing from a round opening in the side of the wellhead
Memo Photo 4: opening of about 2.75 inches, about 36 inches above the ground.

All five images are from the state memo (Memo to File 35-1983, Utah Division of Water Rights, Sept. 28, 2026), as posted on Ogden City's pipeline project website. The Hive has not matched these photos by location to the photo in the Nov. 15 post.

The well the state inspected

Ogden City's pipeline project website links to a Sept. 28, 2026 memo to file from the Utah Division of Water Rights. It was written by Hannah Finley, P.G., of the Well Drilling Program. The subject line reads "35-1983 Jensen-Fowers Farm LLC - Flowing Well in Pineview Reservoir."

ItemWhat the memo says
IdentificationWater right 35-1983; well identification number (WIN) 452337; coordinates 41.2542100, -111.7970750; N 1679 W 88 SE, Section 14, T6N, R1E, SLB&M
Location"approximately 500 feet from the southern shore of Pineview Reservoir on Parcel 200150001 (currently federal land), directly north of the Jensen-Fowers Farm"
History6-inch iron pipe, 65 feet deep, drilled in 1915, flowing without a pump; "originally owned by Simon Jensen, the founder of Jensen Farms"
Before the reservoir"There are no records indicating the wellhead was altered or sealed prior to inundation."
InspectionSept. 25, 2026, with Utah Geological Survey staff. Flow about 20.5 gallons per minute (± 0.5), measured with a bucket and stopwatch at least five times. pH 6.68; 11.2 °C; specific conductivity 798 µS/cm. UGS took water samples, and the results were to be added to the file.
The concernIf the flow stops, "there is significant concern that the open well casing acts as a direct conduit for reservoir water to enter and contaminate the underlying groundwater system."
Recommendation"we highly recommend it be properly abandoned" before the reservoir refills in January 2027. A licensed Utah water well driller must pump cement through a tremie pipe from the bottom of the well (65 feet) to fill the entire casing to the surface.

How the memo was read: the five-page PDF was downloaded from Ogden City's project website on Nov. 17, 2026. The text was extracted, and the map and photo pages were viewed as rendered images.

Is this the same well as in the Nov. 15 post?That hasn't been confirmed. The community post placed the well near a pumpkin patch, and the memo places it directly north of the Jensen-Fowers Farm. The memo photos and the post's photo both show a mineral-crusted wellhead beside a concrete border. The Hive has not matched the two by location, so this page treats them as possibly the same well. It also does not assume the reported capping completed the abandonment the memo recommends.

Timeline

  1. 1915Well drilled, 65 feet, 6-inch iron pipe, flowing without a pump; original owner Simon Jensen (state memo).
  2. 1937Pineview Dam finished; the well goes under the reservoir. The memo found no record that it was sealed first.
  3. 2026Pineview drawn down for Ogden's pipeline replacement project.
  4. Sept. 25, 2026Division of Water Rights and UGS staff inspect the well and measure about 20.5 gallons per minute.
  5. Sept. 28, 2026State memo recommends filling the well with cement from bottom to top before the reservoir refills.
  6. Oct. 27, 2026State Drinking Water Board posts its environmental notice for Ogden's waterline and well replacement project (3F1908).
  7. Nov. 12, 2026Ogden City tells the Standard-Examiner the pipeline crossing is ahead of its Jan. 1, 2027 deadline and expected to finish in December (Justin Anderson, Public Services Executive Director).
  8. Nov. 15, 2026Ogden Valley News posts that the well "has been capped."
  9. Nov. 17, 2026The Hive checks the state well database. WIN 452337 shows no abandonment activity and no water-quality records.
  10. January 2027Planned refill of Pineview (state memo).

Why a flowing old well matters

The Utah Geological Survey's 2019 Special Study 165 on Ogden Valley groundwater looked at old wells under Pineview. These quotes were read directly from the study (printed page numbers):

Ogden City's pipeline project website says the water for the city's wellfield comes from a confined aquifer that is separated from Pineview Reservoir and is not affected by reservoir levels.

These statements answer different questions. The city is addressing whether the drawdown will interrupt its wellfield supply. UGS identified possible paths by which shallower water could reach the confined aquifer. The study does not establish that this exposed well is one of those paths. The state memo raises the same kind of concern about the well it inspected, namely what could happen if its flow stops. It does not report test results.

Background: Ogden's old Artesian Park wells

This part is regional history. It does not establish who owned or is responsible for the well in the memo. The memo associates that well with water right 35-1983, Jensen-Fowers Farm LLC, and identifies Simon Jensen as its original owner.

What state rules say about sealing a well

What the state well database shows (Nov. 17, 2026)

0abandonment entries on WIN 452337
0water-quality records on WIN 452337
9results returned, township search (Abandon only)

What this means: These results describe the online record on Nov. 17. They don't show whether work was done, or whether paperwork has been filed but not yet entered. Whether the 30-day filing deadline has passed depends on when permanent abandonment was completed, which we have not established. The Hive keeps a record of the search settings, results and screenshots. A re-check is scheduled for Dec. 1, 2026.

Three ways to look at it

1. The auditor's view

An audit could examine authorization, compliance, costs and supporting records. Here is what an audit would look for, and what we have located so far:

RecordLocated as of Nov. 17?
State inspection and recommendationFound: Division of Water Rights memo, Sept. 28, 2026
UGS water-sample resultsNot located. None on the WIN 452337 record.
Licensed driller named on the workNot located
Notice to the state engineer before the workNot located
Abandonment logNot located. The WIN 452337 record shows no abandonment activity.
Who paid, and whether it was inside the pipeline projectNot located
Confirmation that the inspected well is the one reportedly cappedNot located

The money. Two public documents give different figures, and they describe the project differently. Each figure is shown with its source:

SourceCostScope
Ogden City project website"$100M""approximately $100 million across all phases through 2029"; 6.4 miles of pipeline
State Drinking Water Board notice, Oct. 27, 2026 (project 3F1908)$87,000,000About 8.2 miles of waterline and "developing a replacement well at the Pineview Well Field"
DWB loan
$34,370,000
WIFIA loan
$42,630,000
Ogden City
$10,000,000

Funding breakdown from the state's Oct. 27 notice (total $87,000,000). WIFIA is a federal water infrastructure loan program. The records reviewed don't show whether sealing the 1915 well falls within this project.

The historic-discovery condition. The same state notice says the project does not "affect any cultural or historical properties." It also says that if anything with possible cultural or historic significance is uncovered during construction, Ogden City "will be required to stop construction and notify both the Division of Drinking Water (the Division) and the State Historic Preservation Officer." KSL reported the exposed century-old well structures on Oct. 13, and the notice was posted Oct. 27. This does not establish that the condition was triggered or missed.

2. The collective view: transparency, financial accountability, environmental impact

3. The legislative view

What we don't know yet

  • Whether the well in the Nov. 15 post is the one the state inspected (35-1983 / WIN 452337)
  • Who closed the well, when, and how: a surface cap, or cement from bottom to top as recommended
  • Whether an abandonment log was or will be filed
  • UGS's water-sample results
  • Who paid

Every item above is also a question you can ask. See Questions to ask, and whom to ask.

Questions to ask, and whom to ask

Use water right 35-1983 and WIN 452337 when you ask.

  1. Utah Division of Water Rights, Well Drilling Program: Has an abandonment log been filed for WIN 452337, and does the closure match the memo's recommendation? Are UGS's water-sample results in the file?
  2. Ogden Public Services: Did the pipeline project close this well, and if so, who did the work and when?
  3. Ogden City Council: If the city paid, was it under the pipeline contract, by change order, or separately?
  4. U.S. Bureau of Reclamation (Provo Area Office): As the federal landholder, did Reclamation have any role in closing the well?
  5. Utah Division of Drinking Water (project 3F1908): Were the exposed historic wells reported under the notice's discovery condition?
  6. Your state legislators: Should sealing an old well on public land come with public notice?

Words to know

Where this connects

Behind this piece

21
records read
18
database line items checked
6
records checked, not used
~18
searches run (estimate)

Counts are estimates from our working notes. Posted Nov. 19, 2026.

Help cover records costs

Public records aren't always free. The Hive Records Fund helps pay records fees, copies and other costs behind pages like this one. You pick the amount, and every dollar in and every cost paid is listed publicly. The Weber County Hive is not a nonprofit, so contributions are not tax-deductible.

Give to the Records FundSee the public ledger →

Sources

Sources — click to open (with links)
Utah Hive Politicsfrom the publisher of The Weber County HiveIndependent · Accountability · Journalism

The Weber County Hive and Utah Hive Politics: the people's publication. We investigate what's best for the public as a whole, not for any party or special interest group. We report public records. You decide.

Send a tipTips we checkedSee a mistake? Tell us

We never name tipsters. When we correct a page, the fix and its date are shown on the page.

Ogden City shelf · Master Index (Hive library) · Read on Substack