Weber County · Ogden Valley · Vendor Records
J-U-B Engineers writes Ogden Valley City's founding land-use plan. It also serves as the city's own engineer. Nine other government and quasi-government bodies in the same small area hire the same firm — including the two ski resorts a boundary committee kept out of the city altogether.
Posted Aug. 30, 2026 · Updated Oct. 16, 2026 · Page look updated Nov. 2, 2026
Planning Manager, J-U-B Engineers. Writes Ogden Valley City's general plan, transportation master plan, and zoning roadmap — the document that sets what gets built where.
A separate J-U-B employee, serving as the city's own engineering authority — the role that checks whether what gets built meets standards.
Confirmed directly on the city's own website: "Ogden Valley City has contracted with J-U-B Engineers, Inc. to provide a broad spectrum of engineering and community planning services." Council-level oversight of the engineering role is provided by a single councilmember, not an independent engineering department. For a city with no staff of its own, the firm that plans what should be built and the firm that certifies it was built right are the same firm.
Powder Mountain was deliberately kept outside Ogden Valley City's incorporation boundary by a committee that included the resort's current president. JUB does direct infrastructure work for the resort itself — a water line project (2025) and sewer lagoon maintenance (2023), both posted under "Powder Mountain Water" and "Powder Mountain Sewer." The same firm sits on both sides of the line that boundary drew.
Per JUB's own marketing material, the firm "helped obtain nearly $24 million dollars from the Wasatch Front Regional Council Surface Transportation Program" for a different client city, Clinton City. Ogden Valley City's own planning work is funded through a similar WFRC program (Transportation and Land Use Connection).
Nine separate government or quasi-government entities across Weber County, all retaining J-U-B for planning, engineering, or bid-solicitation work.
General plan + Deputy City Engineer
Engineer-of-record, ditch piping project
Liberty Park master plan redesign
West water line project
Sewer lagoon maintenance
Booster pump + transmission line, Eden
Highway 158 waterline project
Ditch piping project — only rejected bid on record
Canal pressurization project, cancelled then re-posted
Outside Ogden Valley proper, J-U-B's biggest recurring Weber County client by project count is the Bona Vista Water Improvement District — at least ten separate waterline and tank projects across Harrisville, Marriott-Slaterville, Pleasant View, and unincorporated Weber County since 2018.
Sourced from J-U-B's own QuestCDN bid-posting record (Provider ID 1575650), newest first.
| Project | Client | Location | Posted | Status |
|---|---|---|---|---|
| North Ogden Community Pond | North Ogden City | North Ogden | 2026-03-19 | Final |
| Harrisville Road Waterline: Phase 3 | Bona Vista WID | Harrisville | 2026-02-04 | Pending |
| 1700 S Waterline Project | Bona Vista WID | Marriott-Slaterville | 2025-09-04 | Pending |
| Harrisville Road Phase 2 | Bona Vista WID | Harrisville | 2025-08-28 | Pending |
| CO-OP/HSBCC Canal Pressurization | Co-op Farm Irrigation | Huntsville | 2025-08-21 | Final |
| Powder Mountain West Water Line | Powder Mountain Water | Powder Mountain Resort | 2025-07-29 | Pending |
| W Harrisville Road Waterline | Bona Vista WID | Harrisville | 2025-06-24 | Pending |
| 3MG Hot Springs Tank | Bona Vista WID | Pleasant View | 2024-12-19 | Pending |
| CO-OP/HSBCC Canal Pressurization (orig.) | Co-op Farm Irrigation | Huntsville | 2024-11-07 | Cancelled |
| Liberty Pipeline Booster Pump Station | Liberty Pipeline Co. | Eden | 2024-01-17 | Pending |
| Liberty Pipeline Transmission Line | Liberty Pipeline Co. | Eden | 2024-01-17 | Pending |
| Powder Mountain Sewer Lagoons Maintenance | Powder Mountain Sewer | Eden | 2023-11-29 | Pending |
| 4000 North Canal Crossing Project | Bona Vista WID | Unincorporated | 2023-10-12 | Final |
| Bay Enclosure Project | Ben Quick (individual) | Ogden | 2023-08-01 | Pending |
| Hwy 158/2200 N Waterline | Eden Water Works Co. | Eden | 2023-08-01 | Pending |
| Weber-Box Elder Conservation Dist. Meters | Weber-Box Elder Cons. Dist. | Plain City/Harrisville | 2023-03-01 | Final |
| South Ogden Conservation Dist. Meters | South Ogden Cons. Dist. | Ogden | 2023-03-01 | Final |
| 5500 West-4200 South to 3550 South | J-U-B Engineers (self) | Hooper | 2022-12-21 | Pending |
| Huntsville South Bench Canal Ditch Piping | Huntsville South Bench Canal Co. | Huntsville | 2022-03-31 | Rejected |
| 1900 North Waterline Project | Bona Vista WID | Plain City | 2021-02-02 | Pending |
| 700 North Waterline Project | Bona Vista WID | Harrisville | 2021-02-02 | Pending |
| Harrisville Heights Waterline | Bona Vista WID | Harrisville | 2021-02-02 | Pending |
| Hooper 4700 West (5100 S-5500 S) | Hooper City Corporation | Hooper | 2019-02-05 | Pending |
| North Ogden 3.0 MG Water Tank | Bona Vista WID | North Ogden | 2018-05-15 | Pending |
Utah Hive Politicsfrom the publisher of The Weber County HiveIndependent · Accountability · JournalismThe Weber County Hive and Utah Hive Politics: the people's publication. We investigate what's best for the public as a whole, not for any party or special interest group. We report public records. You decide.
Send a tipTips we checkedSee a mistake? Tell us
Sources: Ogden Valley City's own website (ogdenvalley.gov); J-U-B Engineers' own project pages (jub.com); public QuestCDN bid postings (Provider ID 1575650). This page states what the record shows; it does not characterize any finding as a legal violation.
We never name tipsters. When we correct a page, the fix and its date are shown on the page.
Both Sides of the Table · Master Index (Hive library) · Read on Substack