The post
On Oct. 26, 2026, Sen. John Curtis posted on X that Utah's housing shortage keeps pushing up costs, that building near existing transit can add housing "without adding to traffic," and that the Build HUBS Act, by "cutting some burdensome red tape," can help Utah families afford to stay.
The Build HUBS Act is S. 3636, introduced Jan. 14, 2026 by Sen. Lisa Blunt Rochester (D-Del.) for herself and Sen. Curtis (R-Utah), with a House companion, H.R. 7062. This page reads the bill and checks each claim in the post against public records, including Utah's own transit-zone projects that the Hive has already documented.
It is not law
S. 3636 was introduced Jan. 14, 2026 and referred to the Senate Committee on Environment and Public Works. No hearing, committee vote or floor vote is listed.
The House companion is H.R. 7062.
Supporters are asking Congress to fold the bill into the next federal surface transportation bill. That is how it could become law without a stand-alone vote.
Prices ran away from paychecks
The math: $559,900 ÷ $249,900 = 2.24 (price index 224). $102,900 ÷ $67,480 = 1.52 (income index 152). Price ends at Q1 2026 and income at 2025, the latest year in each source. Price-to-income went from 3.7 years of income in 2016 to 5.4 now. The Hive's Taxation repo found the same pattern for Weber County from 2018: home prices +82.4%, income +34.9%.
What the monthly payment eats
Gardner's estimated payment on a median-priced home is $3,669 a month ($44,028 a year). That is 45.6% of the Gardner median household income of $96,658, and 68.8% of the median renter income of $64,000. The common lending guide is 30%. Gardner puts the income needed at $146,800, which is $50,142 (52%) more than the median household earns.
What "80%" and "120%" of area income mean in dollars
The bill measures "attainable" by area median income (AMI), set each year by HUD. Here is what those levels are locally.
| Level | 1 person | 4 people | Area and year |
|---|---|---|---|
| 50% of AMI | $44,150 | $63,050 | Salt Lake City HUD Metro, 2026 |
| 80% of AMI (the bill's "majority" level) | $70,650 | $100,900 | Salt Lake City HUD Metro, 2026 |
| 100% of AMI | — | $126,100 | Salt Lake City HUD Metro, 2026 |
| 120% of AMI (the bill's top level) | — | $151,320 | Hive math: 1.2 × $126,100 |
| 80% of AMI | $67,500 | $96,400 | Weber County, effective June 1, 2025 |
For a family of four in the Salt Lake metro, the bill's top "attainable" level ($151,320) is higher than the $146,800 Gardner says it takes to buy the median Utah home. Its 80% level ($100,900) is higher than Utah's median household income ($96,658). HUD's area figures and Gardner's statewide median are measured differently, so treat these as close comparisons, not exact ones.
Can your household buy the median Utah home?
Uses Gardner's 2026 figures: $146,800 income needed with 10% down, $3,669 monthly payment. Rough guide only; your rate, down payment and debts change the answer.
What the post says, and what the record shows
| What they say | What the record shows | Record |
|---|---|---|
| "Increasing the housing supply will help" costs. | Utah built more homes in 2020–2022 than at any time in its history. Over the decade prices still rose 124% while income rose 52%. Supply did help rents: apartment asking rents fell 2.3% from March 2024 to March 2026. It has not brought buying within reach: 91% of renters are priced out. | KUTV/Gardner (building); Gardner 2026 State of the State's Housing Market |
| Transit routes let us add housing "without adding to traffic." | Kimball Junction, a Utah transit zone, includes a 1,000-vehicle parking podium and a pedestrian bridge over SR-224, and construction waits on UDOT road improvements not expected to bid until late 2027. It qualifies through a planned bus rapid transit line, not rail. | GOEO HTRZ approval release; Hive Taxation case file |
| "Giving communities the tools to build near transit." | Utah already has the tools. Kimball Junction was the 9th Housing and Transit Reinvestment Zone approved statewide. There, S.B. 84 (2023) overrode county approval, and a developer PAC reported spending $94,435 against the citizen referendum. | GOEO release; S.B. 84; disclosures.utah.gov |
| "Cutting some burdensome red tape." | The bill adds federal environmental-review (NEPA) categorical exclusions for office-to-housing conversions in the same footprint and for building on land already disturbed for transportation. Land bought before a loan application is exempt from NEPA unless a public entity will own it. | S. 3636, Secs. 3–4 |
| The bill can help Utah families "afford to stay." | The bill's "attainable" housing serves incomes up to 120% of area median, with a majority of units at or below 80%. The text sets no time limit and no deed restriction. Ordinary transit projects can borrow with no affordable units at all. | S. 3636, TIFIA §601(a)(1) |
| (Not in the post) Who pays. | "Attainable" projects borrow at half the U.S. Treasury rate, and projects no longer need an investment-grade credit rating. In Utah's own zones, up to 80% of new property tax growth stays in the project for 25 years instead of going to schools, the county and fire districts. | S. 3636 §603(b)(4)(D), §612(c); GOEO Kimball release |
What the Build HUBS Act does, step by step
The government has a big lending piggy bank
Washington keeps money it lends out to build roads and train tracks. People who borrow it have to pay it back, plus a little extra called interest.
This bill lets builders borrow it for homes and stores
If they build within a half mile of a train or bus station (about a 10-minute walk), builders could borrow from that piggy bank to put up apartments, homes and shops.
Some homes have to cost less to get a discount
If more than half of the homes are priced for families who earn less than most of their neighbors (80% of the area's middle income or less), the builder pays only half the normal interest.
But the bill doesn't say for how long
Nothing in the bill says those homes must stay cheaper for 5 years, 30 years, or any number of years. No promise is written on the property.
Builders with no cheaper homes can still borrow
They just don't get the half-price interest. A project near a station can use the loans even if every home is full price.
Some checking gets skipped
Usually the government checks how a project affects nature and neighbors. The bill skips that check when an old office is turned into homes, or when building on land already used for roads or trains.
Your town still makes the rules
The bill says it does not change your city's or county's rules about what can be built where.
Example uses a 4.5% rate to show the idea. The $2.25 the government doesn't collect is money it would otherwise have earned for all taxpayers.
Who is cheering for it: home builders, Realtors, apartment owners and city planning groups. What it gives builders: cheaper loans and less paperwork near stations. What it doesn't promise families: that the cheaper homes stay cheaper.
What S. 3636 actually does
- Extends two federal loan programs (TIFIA for transportation, RRIF for railroads) for fiscal years 2027–2031 and lets them lend for transit-oriented development within a half mile of a rail, bus rapid transit or multimodal station. No dollar amount is written into the bill.
- Defines "attainable housing" as serving households up to 120% of area median income, with a majority of units affordable at or below 80%. No time limit, no deed restriction in the text.
- Half-price interest: attainable housing loans are set at one-half the Treasury rate when the loan is signed.
- Lower credit bar: TIFIA projects "shall not be required to have an investment-grade rating." Private lenders approved as "originator-servicers" can underwrite the loans for the government, modeled on HUD's multifamily system.
- NEPA exclusions for office conversions and building on already-disturbed transportation land.
- No zoning takeover: Section 5 says nothing in the Act preempts state or local zoning.
- Backers named on the sponsors' one-pager include the National Association of Home Builders, the National Association of REALTORS, the National Apartment Association, The Real Estate Roundtable and planning groups. Utah Transit Authority board chair Carlton Christensen is quoted in support.
What half the Treasury rate is worth to a borrower
Example inputs, not a real loan. Simple level payments, full Treasury rate compared with half of it. The difference is interest the borrower doesn't pay to the federal lender.
Requires: the half rate only for projects where most units are at or below 80% of area median income; coordination with the regional planning organization; federal labor standards; local zoning stays local. Leaves out: any time limit or deed restriction on "attainable" units, any affordable share for ordinary transit-project loans, and any public report of which projects get loans.
How the bill measures against the Hive's three tests
The Hive judges deals and bills on transparency, financial accountability to the public, and environmental impact. Here is where S. 3636 lands on each, from its own text.
| Test | Could help | Could harm | Neutral or unknown |
|---|---|---|---|
| Transparency | Bill text, one-pager and section-by-section are public. Fee structures and loan guidance (debt coverage, loan-to-value) must be published. | Private "originator-servicer" lenders would underwrite loans for the government. The bill does not require public reporting of which projects get loans or how many units stay affordable. | Projects must coordinate with the regional planning organization (in Weber, Davis and Salt Lake counties, the Wasatch Front Regional Council). |
| Financial accountability | Loans are repaid, not grants. The half rate only applies when most units are at or below 80% of area income. | Half-Treasury-rate loans are interest the federal lender does not collect. No investment-grade rating is required, so riskier projects can qualify. No time limit or deed restriction keeps units affordable. | No dollar amount is in the bill; the cost depends on what Congress funds later. |
| Environmental impact | Building on land already used for roads and rail, and converting empty offices, uses land that is already disturbed instead of open land. | Those projects skip a federal environmental review (NEPA categorical exclusion), so the public may get less notice and study. | Water, traffic and school capacity stay with local governments, which keep their zoning power. |
The bill can add homes near transit with cheaper federal loans. Whether those homes stay within reach of the families the label names depends on rules the bill leaves out: how long units stay affordable and who reports on them. Utah's own transit zones show what happens when those rules are loose.
Who lobbied for it, and who gave to Sen. Curtis
Federal lobbying reports that name Build HUBS (2026)
These groups listed the Build HUBS Act among the issues they lobbied on in their 2026 quarterly reports to Congress. The dollar figures are each group's total lobbying for the quarter on all issues, not money spent on this bill alone.
| Group | Quarters naming the bill | Total lobbying reported those quarters (all issues) |
|---|---|---|
| National Association of REALTORS | Q1, Q2, Q3 | $15,460,000 · $14,580,000 · $27,400,000 |
| National Multifamily Housing Council | Q1, Q2, Q3 | $2,650,000 · $2,330,000 · $1,670,000 |
| Mortgage Bankers Association | Q1, Q2, Q3 | $770,000 · $1,220,000 · $840,000 |
| American Public Transportation Association | Q1, Q2, Q3 | $350,000 · $660,000 · $420,000 |
| Up for Growth Action | Q3 | $50,000 |
| Niskanen Center | Q1, Q2, Q3 | (not listed) · (not listed) · $10,000 |
Bill backers' PACs that gave to John Curtis for Utah (2023–2024)
| PAC | Dates | Total |
|---|---|---|
| BUILD PAC, National Association of Home Builders | Dec. 18, 2023; Sept. 27, 2024 | $10,000 |
| Realtors PAC (RPAC), National Association of REALTORS | Oct. 6, 2023; Aug. 23, 2024; Sept. 6, 2024 | $7,000 |
| National Multifamily Housing Council PAC | June 26, 2023; July 31, 2024 | $6,000 |
| National Apartment Association PAC | Dec. 10, 2024 | $5,000 |
| Total | $28,000 |
From FEC itemized receipts for John Curtis for Utah (committee C00647339), searched Oct. 26, 2026. These are routine, legal PAC contributions, reported as required. They are listed so readers can see the overlap between the bill's backers and the sponsor's donors. Curtis's next Senate election is 2030; no 2025–2026 receipts from these PACs appeared in the search.
Utah Transit Authority's federal lobbyists
UTA, whose board chair is quoted supporting the bill, reported paying two federal lobbying firms in 2026: Barker Leavitt PLLC ($55,000 a quarter) and Cardinal Infrastructure LLC ($30,000 a quarter), $255,000 for the first three quarters. The issue descriptions in those reports name transit grants and the surface transportation bill; they do not name Build HUBS, TIFIA or housing (read from the LDA.gov filing data, Oct. 26, 2026).
Utah bills sold as housing or affordability, and what the record shows
Each of these was presented as helping housing supply or affordability. The right column is what the public record shows about cost and who pays. Sponsors are the primary sponsors.
| Bill | What it did | What the record shows about cost |
|---|---|---|
| S.B. 228 (2019) Public Infrastructure District Act | Created Utah's PIDs, which let developer-led boards issue bonds repaid by assessments on homes inside the district. | PID bonds issued statewide reached $5.267 billion as of Aug. 7, 2026, up from about $4 billion in fall 2025 (State Auditor's office). The Treasurer's office testified PID interest runs 2–3% higher than state or city borrowing. Only 62.5% of districts filed required reports (Auditor, Jan. 2026). Buyers and renters pay the assessments. |
| S.B. 217 (2021) HTRZ · Sen. Wayne Harper | Lets a project near a station keep most of its new property tax growth. | Kimball Junction: up to 80% for 25 years, 385 of 885 units at market rate. Vineyard RDA plus HTRZ: about $900 million diverted from schools. |
| S.B. 84 (2023) Sen. Wayne Harper | Changed the approval path the Kimball Junction project used, over the county's own approval. | A developer PAC reported spending $94,435 against the citizen referendum; Summit County's share of the project is about $55 million, backed by a new sales tax. |
| S.B. 268 (2024) FHIZ · Sen. Harper / Rep. Musselman | First Home Investment Zones for starter homes, also paid for with captured tax growth. | Utah PTA opposed it because it takes tax increment that would go to school districts. |
| S.B. 168 (2024) HOPZ · Sen. Lincoln Fillmore | Home Ownership Promotion Zones on small sites, same captured-growth method. | Same cost path: growth revenue goes to the project instead of schools, county and other taxing entities. |
| H.B. 37 (2025) Rep. Jim Dunnigan · Sen. Fillmore | Density bonuses in exchange for owner-occupancy deed restrictions; also changed the preliminary-municipality incorporation statute. | Passed the House 58-9; the House vote on Senate changes was closer, 39-30. Its deed restrictions are the kind Build HUBS leaves out. |
| H.B. 492 (2026) Rep. Calvin Roberts · Sen. Kirk Cullimore | Created a $100 million "State Housing Infrastructure Partnership Fund." | $18 million of it is a loan to the Point of the Mountain State Land Authority that the introduced bill labeled "for prison infrastructure projects"; that label was removed in the first substitute. The bill also moves $50 million a year from the Transportation Investment Fund to convention center reserves and raises transportation bonds for housing infrastructure grants from $70 million to $150 million. |
| S.B. 39 (2026) Sen. Wayne Harper | Put HTRZ, FHIZ, HOPZ and the other zone tools under one chapter of state code. | Kept the captured-growth method in place for all of them. |
| H.B. 507 (2026) | First law requiring PID costs be disclosed to buyers, and stops new HTRZ/FHIZ/HOPZ after Jan. 1, 2028. | Disclosure can come "at or before closing," after earnest money is down. The zones it stops are replaced by a broader tool (RSDZ). |
| Did not pass (2026) | H.B. 422 (Rep. Jill Koford): public conflict-of-interest disclosure for PID board members. HJR 7: raise the residential property tax exemption from 45% to 60%. | H.B. 422 passed the House 66-1. Both died at the 11:59 p.m. end of session on March 6, 2026. |
Three bills get pointed to as protections. H.B. 507's PID disclosure can come at or before closing, after a buyer's earnest money is already down. H.B. 37's deed restrictions apply only where a city or county opts into its density bonus. S.B. 23 (2025) changed FHIZ density and affordability rules but kept the captured-tax-growth method in place. The bills that would have shown the public the cost up front (H.B. 422) or lowered homeowners' property taxes (HJR 7) did not pass.
How much growth revenue these tools have taken, project by project
Tax increment is the new property tax a project generates after a base year. Under these tools, most of it goes back to the project instead of to schools, counties, fire and water districts. These are the amounts already documented in Hive research files. Housing-labeled tools are gold; the others are navy.
| Project | Tool | Amount | What the figure is |
|---|---|---|---|
| Vineyard RDA + HTRZ (Utah Co.) | HTRZ / RDA | $900,000,000 | Increment diverted from Alpine and Timpanogos school districts and other entities, per Hive Utah County research |
| Eagle Mountain Sweetwater #4 CRA (Meta expansion) | CRA (data center) | $778,540,678 | Total increment approved, 2026 |
| West Weber UIPA project area (Weber Co.) | UIPA tax differential | $343,000,000 | Projected to UIPA over 25 years (75% of growth) |
| Golden Spike UIPA project area (Box Elder Co.) | UIPA tax differential | $131,250,000 | 75% of the $175 million projected over 25 years (Amendment #3, May 21, 2026, p. 22); Hive math for the 75% share |
| Lehi Thanksgiving Station HTRZ | HTRZ | $122,000,000 | Approved by the state HTRZ committee Nov. 13, 2023 |
| Eagle Mountain Sweetwater #2 CRA | CRA (data center) | $77,854,134 | Total increment, 2021 |
| Nordic Village CRA (Ogden Valley) | CRA / PID | $55,000,000 | Maximum from county, school, fire and water over 15 years |
| Weber County CRA areas, 2021–2024 | CRA (about 21 areas) | $52,388,037 | Already diverted, all taxing entities, per the county's CRA 700 reports |
| Eagle Mountain Sweetwater #3 CRA (QTS) | CRA (data center) | $20,419,625 | Total increment, 2023 |
| Kimball Junction HTRZ (Summit Co.) | HTRZ | $8,000,000 | Low end of the $8–12 million estimate (up to 80% for 25 years) |
| Total named in these records | $2,488,452,474 | About $2.49 billion. A mix of amounts already diverted, approved caps and official projections, added together only to show scale. |
Stratos, the 40,000-acre data center project area MIDA approved April 24, 2026 in Hansel Valley, sits in the same county as Golden Spike. MIDA has not published a project area budget, projected tax differential or the share it keeps; its Stratos page lists no budget and says more information is "coming soon." What is on record: a 50-year interlocal term with Box Elder County; MIDA's energy tax on data center campuses set at 0.5% instead of 6%; $16.2 million in upfront payments to the county; county revenue estimated at about $30 million a year (first 3 GW) and $108 million a year (9 GW); and, per The Salt Lake Tribune, an estimated $49 million a year in property taxes to MIDA at full buildout, with about 80% of the property tax at the reduced rate rebated to the developer. Because no total has been disclosed, Stratos is not in the $2.49 billion figure.
More on Stratos: Stratos, the Ruby Pipeline, and MIDA (Hive explainer).
PID bonds ($5.267 billion statewide) are debt repaid by property owners inside districts, not tax increment. UIPA's Crossroads PID sold $150 million in tax-differential bonds. UIPA leases two unused Salt Lake City lots for up to $120,000 a month (Tribune, 2023), and lent PCC Land LLC $5 million for West Weber sewer work (2025 approval). These are separate from the increment above.
Eagle Mountain's Sweetwater #1 increment, Pole Canyon's dollar total (its 2019 budget gives the 60% share and the city's "approximately $3 million" benefit, but no agency total), the Mid-Valley CRA, Weber County's 2025–2026 CRA reports, Nordic Village's actual diversion, and amounts for Utah's other HTRZs have not been published in records the Hive has found. The real total is higher than this table.
The statewide total, from the Utah State Tax Commission
The Tax Commission reports how much property tax is paid as tax increment each year. In 2024 it was $304,668,763, or 6.00% of all property taxes collected in Utah ($5,080,088,841). That is up 83% from $166,509,138 in 2015. Over the 10 years from 2015 to 2024, $2,150,295,962 was paid as increment.
| Year | All of Utah | Weber County |
|---|---|---|
| 2015 | $166,509,138 | $18,114,800 |
| 2016 | $168,976,603 | $17,683,824 |
| 2017 | $171,045,549 | $16,244,195 |
| 2018 | $176,361,578 | $15,468,363 |
| 2019 | $210,935,557 | $16,468,328 |
| 2020 | $213,517,674 | $9,710,026 |
| 2021 | $223,979,978 | $10,712,651 |
| 2022 | $239,546,488 | $13,041,275 |
| 2023 | $274,754,634 | $14,387,636 |
| 2024 | $304,668,763 | $14,246,487 |
Share of 2024 property taxes paid as increment, by county: Beaver 18.20%, Box Elder 9.31%, Salt Lake 9.12%, Tooele 6.47%, Utah 5.88%, Davis 4.06%, Weber 3.87%, Wasatch 2.37%, Summit 1.86%, Washington 0.75%. Source: 2024 Annual Property Tax Statistical Report, Tables 13 and 14. The Tax Commission describes these as property tax dollars paid to redevelopment agencies; a 2022 legislative audit said the comparable figure it used left out MIDA, the Inland Port Authority and the convention center hotel, so the full total is likely higher.
Utah's transit and housing zone tools, 2018–2028
Utah created a new tax-increment zone tool almost every session. Each one sends future tax growth back into a project. Over the same years, the single-family median more than doubled.
%%{init: {'theme':'base','themeVariables':{'fontSize':'20px','primaryColor':'#ffffff','primaryBorderColor':'#10233f','primaryTextColor':'#10233f','lineColor':'#b8863b'}}}%%
flowchart TB
A["2018 · Transportation Reinvestment Zone"] --> B["2021 · HTRZ, S.B. 217
primary sponsor Sen. Wayne Harper"]
B --> C["2024 · First Home Investment Zone, S.B. 268
Sen. Harper / Rep. Musselman"]
C --> D["2024 · Home Ownership Promotion Zone, S.B. 168
Sen. Lincoln Fillmore"]
D --> E["2025 · Convention Center Reinvestment Zone, S.B. 26"]
E --> F["2026 · S.B. 39 puts them under one chapter
Sen. Harper"]
F --> G["2026 · H.B. 507: no new zones after 1/1/2028
replaced by a broader tool (RSDZ)"]
G --> H["2026 · Build HUBS Act adds federal loans
for the same kind of transit projects"]
885 units: 385 market rate (43.5%), 315 at 60% of area median (35.6%). Other "deed-restricted" tiers run up to 120% of area median, about $128,520 a year for one person. Up to 80% of new tax revenue stays in the project for 25 years; Summit County's own share is about $55 million.
Taxation repo · Cheap on Paper400 tax-credit units at about $1,289 rent, but PID taxes and unbundled fees bring tenant costs to about $1,600–$1,900 a month. Affordable units are about 0.5–1% of the 600-acre project. The River District solicitation seeks 800–900 market-rate for-sale homes with no affordable requirement.
Transparency repoAn older redevelopment area plus an HTRZ divert about $900 million in tax growth that would otherwise reach Alpine School District and, later, Timpanogos School District.
Utah County PID explainerWhere the money goes
%%{init: {'theme':'base','themeVariables':{'fontSize':'20px','primaryColor':'#ffffff','primaryBorderColor':'#10233f','primaryTextColor':'#10233f','lineColor':'#b8863b'}}}%%
flowchart TB
P["New project near transit"] --> T["New property tax growth"]
T -->|"up to 80% for 25 years"| Z["Stays in the project (HTRZ)"]
T -->|"what's left"| S["Schools, county, fire district"]
S --> R["Residents cover growth costs
through rates and taxes"]
P --> PID["PID assessment on each home"]
PID --> B["Buyer or renter pays it"]
P --> L["Federal loan at half the Treasury rate
(Build HUBS)"]
L --> F["Interest the federal lender doesn't collect"]
The Hive's PID payoff-at-sale proposal: in new districts, residential PID assessments are paid in full before a home goes to its end user (the model in St. George's Tech Ridge PID governing document), with a fallback of written disclosure before earnest money and a public hearing when a district annexes beyond a set size. See The Story of the "Affordable" House.
How many other states this reaches
It is a federal bill, so it would apply in every state with rail, bus rapid transit or multimodal stations that qualify for TIFIA or RRIF loans.
Every state except Arizona, plus Washington, D.C., has a law allowing tax increment financing. Arizona repealed its TIF law in 1999.
The same homeowner-assessment model is used in other states under other names, such as Public Improvement Districts and Municipal Utility Districts in Texas and Community Development Districts in Florida.
The TIF count comes from a secondary summary (Wikipedia, citing state enabling laws); the special-district examples from RCLCO's review of master-planned community financing.
Where these projects sit
Every Wasatch Front rail station, with the half-mile circle
The bill's loans reach projects within a half mile of a station (about a 10-minute walk). Each circle below is a true half-mile radius. Navy circles are FrontRunner; gold are TRAX. Tap a circle for the station name.
Bigger version with a station search: MAP 010: The Half-Mile Around Every Station (Utah Maps).
65 FrontRunner and TRAX stations. Station locations from OpenStreetMap, U.S. DOT and Wikipedia coordinates. Bus rapid transit stops (Ogden's OGX and Utah County's UVX) also qualify under the bill but are not shown yet. The closed Pleasant View FrontRunner station is left off.
Projects in this file
Approximate locations from latitude and longitude; lake outline simplified.
Questions readers can ask
Salt Lake City office: 125 S. State Street, Suite 8402, Salt Lake City, UT 84138 · (801) 524-4380
Provo office: 3601 N. University Ave., Suite 250, Provo, UT 84604 · (801) 841-2665
Washington: SH-502 Hart Senate Office Building, Washington, DC 20510 · (202) 224-5251
Online: curtis.senate.gov/contact/share-your-opinion/
1. The federal surface transportation bill, where supporters want Build HUBS added.
2. Your city's station area plan. Utah's H.B. 462 (2022) already requires cities with FrontRunner, TRAX or BRT stations to adopt plans for the half mile around rail stations, including housing availability and affordability.
3. The 2027 Utah Legislature, including the PID payoff-at-sale proposal on this page.
Who is connected, and why
Sen. John Curtis (R-Utah)
Sen. Lisa Blunt Rochester (D-Del.)
Sen. Wayne A. Harper (R-Utah)
Jefferson Moss
Carlton Christensen
Glossary (tap a word)
TIFIA
A federal loan program for transportation projects. The bill would let it lend for homes and shops near stations.
RRIF
A federal loan program for railroads and rail stations, changed the same way.
NEPA
The National Environmental Policy Act. It requires federal review of how a federally funded project affects the environment.
Categorical exclusion
A type of project the government decides can skip the full NEPA review.
AMI
Area median income. Half the households in an area earn more, half earn less. HUD sets it each year.
Treasury rate
The interest rate the U.S. government pays to borrow. TIFIA loans are normally priced near it.
Transit-oriented development (TOD)
Homes, shops and offices built close to a train or bus rapid transit station.
HTRZ
Housing and Transit Reinvestment Zone, a Utah tool (2021) that lets a project near a station keep most of its new property tax growth.
PID
Public Infrastructure District. Homeowners inside it pay a yearly assessment that repays bonds for roads, pipes and other infrastructure.
Deed restriction
A promise written on the property records that keeps a home affordable for a set number of years, even after it sells.
Show all sources (tap to open)
- Sen. John Curtis, post on X, Oct. 26, 2026 (screenshot on file).
- S. 3636, Build Housing, Unlock Benefits and Services Act, 119th Congress, introduced Jan. 14, 2026. congress.gov
- H.R. 7062, House companion. govinfo.gov
- Build HUBS one-pager, offices of Sens. Blunt Rochester and Curtis. bluntrochester.senate.gov
- Sen. Curtis press release on Build HUBS (UTA quote). curtis.senate.gov
- Construction Dive, Build HUBS Act summary. constructiondive.com
- Kem C. Gardner Policy Institute, State of the State's Housing Market, Sept. 2026, as reported by Propmodo, FOX 13 and Utah Business.
- U.S. Census Bureau, Median Household Income in Utah (MEHOINUSUTA646N), via FRED.
- KUTV, Utah's housing market faces construction labor shortage (record building 2020–2022). kutv.com
- Deseret News, 2026 Utah Community Quality of Life Index (91% vs. 59%). deseret.com
- Governor's Office of Economic Opportunity, Kimball Junction HTRZ approval release, April 15, 2026 (as documented in the Hive's Taxation case file).
- S.B. 217 (2021), S.B. 268 (2024), S.B. 168 (2024), S.B. 26 (2025), S.B. 39 (2026), H.B. 507 (2026), S.B. 84 (2023), le.utah.gov.
- Point of the Mountain State Land Authority board minutes, Feb.–May 2026; River District solicitation RA26-157 (as documented in Hive files).
- Hive Taxation repo, "Cheap on Paper" (Weber County price vs. income; Kimball Junction tiers). Taxation repo
- Hive PIDS-Utah pages: The Story of the "Affordable" House, Utah County PID explainer, PID Mechanism Map.
- Tech Ridge PID Governing Document (10/17/2024) and Second Amendment to Assessment Ordinance (6/13/2025), utah.gov/pmn/files/1286609.pdf.
- HUD FY2026 Income Limits Summary, Salt Lake City UT HUD Metro (city of Salt Lake posted copy). slc.gov
- Utah Dept. of Workforce Services, HUD income limits by county, effective 06/01/2025. jobs.utah.gov
- S. 3636 status: referred to Senate Environment and Public Works. congress.gov
- Smart Growth America, coalition letter urging Build HUBS in transportation reauthorization. smartgrowthamerica.org
- Lobbying Disclosure Act reports (LD-2), 2026, searched for "Build HUBS," "S. 3636" and "H.R. 7062"; and UTA's 2026 LD-2 reports. lda.gov
- FEC itemized receipts, John Curtis for Utah (C00647339), 2023–2024 and 2025–2026 periods. fec.gov
- Sen. Curtis office contact page. curtis.senate.gov
- Utah H.B. 462 (2022) station area plans, LUAU presentation. luau.utah.gov
- Station locations: OpenStreetMap contributors; U.S. DOT light rail stations layer; Wikipedia coordinates for four TRAX stations.
- Hive research files on H.B. 492 (2026): introduced bill, 1st substitute (2/18/2026), enrolled bill and Legislative Fiscal Analyst fiscal note, le.utah.gov.
- State Auditor's office PID debt figure ($5.267 billion, as of 8/7/2026) and Jan. 2026 testimony to the Rules Review and General Government Oversight Committee (62.5% report submission).
- H.B. 37 (2025), S.B. 262 (2025), S.B. 23 (2025), H.B. 422 (2026), HJR 7 (2026), le.utah.gov bill status and vote records.
- Weber County CRA 700 Reports, tax years 2021–2024 (county filings, as compiled in the Hive's Nordic Village case file).
- Nordic Village CRA interlocal agreements and Project Area Plan (Weber County, signed April 2, 2026).
- West Weber Project Area Plan and Amendment #1, Utah Inland Port Authority (projected $343 million tax differential).
- Utah HTRZ Committee minutes, Nov. 13, 2023 (Lehi Thanksgiving Station, $122 million).
- Eagle Mountain RDA records and Report 700 (Sweetwater CRAs #2–#4).
- Utah State Tax Commission, 2024 Annual Property Tax Statistical Report, Table 13 (Property Tax Revenue Paid as Tax Increment by County, 2015–2024) and Table 14 (Increment as a Percentage of Property Taxes Collected). tax.utah.gov
- Office of the Legislative Auditor General, Report 2022-10, performance audit of tax increment financing (246 project areas; $17.2 million unexpended). le.utah.gov
- Golden Spike Project Area Plan & Budget, Amendment #3, May 21, 2026, p. 22. inlandportauthority.utah.gov
- Eagle Mountain RDA, Pole Canyon Project Area Budget, adopted May 7, 2019. utah.gov/pmn
- Wikipedia, "Tax increment financing" (state TIF laws); RCLCO, "Infrastructure Financing in Master-Planned Communities." wikipedia.org · rclco.com
- MIDA, Stratos Project Area page (documents posted; no budget listed). midaut.org
- Interlocal Cooperation Agreement between MIDA and Box Elder County (Stratos), effective May 4, 2026, §§ 1, 6. boxeldercountyut.gov
- The Salt Lake Tribune, Box Elder County hyperscale data center vote, May 4, 2026. sltrib.com